PROPOSED CAPITAL
           PLAN
     Colchester Public Schools
DISTRICT GOALS
SUPPORT              ENSURE               SHOWCASE            INCREASE
• All students to    • All members of     • Schools and       • Academic
 access a rigorous    our school           programs to          achievement for all
 regular education    system feel          encourage            students through
                                                                the
                      valued, accepted,    involvement and
                                                                implementation of
                      and connected        foster community
                                                                high-quality
                                           pride                curriculum and
                                                                programs to meet
                                                                high standards for
                                                                individual growth
WHAT IS A
CAPITAL PLAN?
•   Identifies projects for the district in need
    of replacement or improvement.
•   Creates a long-term vision to fund
    projects in a sustainable way
•   Prioritizes larger projects that would not
    be covered through normal operating
    budget
HISTORY OF CAPITAL PLANS FOR COLCHESTER
PUBLIC SCHOOLS
   Historically has not been created with a long-term vision for the district


   Has not been supported from year to year in BOE budget


   Historically identified short term projects per building from year to year


   Shared with the Board of Education but not widely advertised


   In many cases, the district has addressed capital concerns reactively versus proactively
PLAN CREATION
Starting in mid-October, a committee of volunteers started
meeting with a vision to evaluate the needs of schools and the
district, to identify the most pressing items, AND to collaborate
with local leaders to chart a path forward.

       The Facilities Committee toured all buildings and identified
       both short-term and long-term projects so that Colchester
       Public Schools can have the best environment for our
       students to learn.


              The Facilities Committee then met and discussed the
              wide-ranging projects and created a recommendation of
              projects based on the needs of the district.
FACILITIES COMMITTEE FINDINGS
                  •   New carpeting in areas
                      at CES and JJIS
DISTRICT          •   Refinished gymnasium
ACCOMPLISHMENTS       floors at CES and JJIS
FUNDED BY LOCAL   •   Ongoing blinds/shades
                      replacement at CES
BOE BUDGET AND    •   Ongoing upgrades to
GRANT FUNDING         energy efficient lighting
                      throughout the district
                  •   Internet infrastructure
                      update where needed
                  •   Phone system upgrade
                  •   New Tech Shop flooring
                      at BA
COMPLETED
PROJECTS
New gym floors
Carpeting at CES and JJIS
Phone system upgrade
NEEDS BY
BUILDING
CAPITAL PLAN

COLCHESTER ELEMENTARY SCHOOL
Project Name                  Cost         Age            Approx. Life
                                                          Expectancy
Chiller 1 and 2 Replacement   $1,200,000   17 years old   20 years
Oil Tank Replacement          $80,000      17 years old   25 years
Heating Controls Upgrade      $30,000      17 years old   20 years
Fire Panel Upgrade            $130,000     17 years old   20 years
Window Shades                 $60,000      17 years old   Beyond useful life
Parking Lot (front)           $350,000     17 years old   30 years
Asphalt/Infrastructure
CAPITAL PLAN

JACK JACKTER INTERMEDIATE SCHOOL
Project Name                         Cost         Age            Approx. Life
                                                                 Expectancy
Oil Tank Replacement                 $130,000     18 years old   20 years
Chillers 1 and 2 Replacement         $1,200,000   18 years old   20 years
Boilers 1 and 2 Replacement          $280,000     18 years old   30 years
Parking Lot Asphalt/Infrastructure   $400,000     18 years old   30 years
Replace Fire Alarm System            $130,000     18 years old   20 years
Replace Building Management System   $125,000     18 years old   20 years
Concrete Work/Tree Removal           $80,000      18 years old   Regular Maintenance
                                                                 Required
Playground Repairs                   $50,000      17 years old   Regular Maintenance Required
Roof Repair                          $2,500,000   18 years old   30 years
CAPITAL PLAN

WILLIAM J. JOHNSTON MIDDLE SCHOOL
Project Name          Cost      Age           Approx. Life
                                              Expectancy
Refinish Gym Floors $16,000     6 years old   Regular Maintenance
                                              Required every 10 years
Ongoing                         6 years old
Sanitation Issues
Grading Issue         $30,000   6 years
around the building
CAPITAL PLAN

BACON ACADEMY
Project Name                         Cost         Age               Approx. Life
                                                                    Expectancy
Roof Replacement                     $4,000,000   30 years old      30 years
Athletic Field Replacement           $7,500,000   30 years old      Beyond useful life
Building Management System           $125,000     30 years old      Beyond useful life
Theater Lighting and Sound           $250,000     5 years (sound)   Beyond useful life
                                                  30 years
                                                  (lighting)
Fire Alarm Replacement               $150,000     30 years old      Regular maintenance and
                                                                    inspections required
Parking Lot Asphalt/Infrastructure   $1,500,000   30 years old      30 years
Floor Coverings Phase 1 of 3         $180,000     30 years old      Approaching end of life
(main level)
CAPITAL PLAN

BACON ACADEMY
Project Name                      Cost       Age        Approx. Life Expectancy
Boilers 1 and 2 Replacement       $320,000   30 years   Regularly maintained and
                                             old        approaching end of life
Furniture Replacement (general    $5,500     30 years
purpose classroom)                           old
Vegetation and Trees              $80,000    30 years   Regular maintenance required
                                             old
Blinds                            $60,000               Beyond useful life
Air Controllers Replacement 1st   $250,000   30 years   Regularly maintained
Floor                                        old        and approaching end of life
Air Controllers Replacement 2nd   $200,000   30 years   Regularly
Floor                                        old        maintained and approachin
                                                        g end of life
CAPITAL PLAN

DISTRICT
    Project Name                  Cost         Age
    Sound Field Systems           $2,000 per   Non-existent
                                  classroom
    Furniture Replacement Cycle   $5,500 per   30 years old
                                  classroom
    Security Window Film                       Improvements
                                               Ongoing
ACTION STEPS
AS DETERMINED BY
THE FACILITIES
COMMITTEE
   PRIORITIZING
   PROJECTS
After touring all the
buildings and creating the
previously shared list of
projects, the Facilities
Committee met to discuss,
survey, and determine the
most urgent needs of the
district. The Committee was
in consensus on the
recommended projects.
 PRIORITIZING
 PROJECTS
The district has worked
diligently to complete small
improvements that fall
within the operating budget
set each school year, but
many projects cannot be
completed using our
current budget or available
grants. The staff has also
strived to maintain our
aging systems to the best
of their abilities, but many
systems are reaching an
age where maintenance will
not be able to fix the
existing problems.
HIGHEST PRIORITY
PROJECTS
• BA Roof Replacement
• BA Athletic Field
 Replacement
• BA Theater Lighting and
 Sound
HIGHEST PRIORITY
BA ATHLETIC FIELDS   TENNIS COURTS   BA ROOF
HIGHEST PRIORITY
PROJECTS
• JJIS Concrete Work / Tree
 Removal (near the night
 entrance)
• JJIS Playground Repairs
• BA Building Management
 System
                                      BA BUILDING
JJIS TREE REMOVAL   JJIS PLAYGROUND   MANAGEMENT
                                      SYSTEM
JUSTIFICATION
•   The Bacon Academy outdoor athletic complex is in disrepair and some
    areas have been closed.
•   The tennis courts and dugouts for baseball and softball are unsafe for
    student use.
•   The grass turf on all fields is not maintained at a high level and overused.
    During the school year, a wide range of teams use all fields which does not
    allow the fields to recover between seasons.
•   Seating and pathways for spectators in some areas are not ADA
    compliant.
PRIORITY PROJECTS FOR THE NEAR FUTURE
•   Bacon Academy Flooring Phase 1 of
    3
•   Bacon Fire Alarm Replacement
•   Bacon Academy Air Controllers
•   CES Heating Controls
•   JJIS and CES Oil Tank Replacement
•   JJIS Building Management System
•   Sound Fields for the classroom
JUSTIFICATION
• The previously identified projects, as determined by the committee,
    need repair or replacement in the near future. Currently they are
    functioning but reaching the end of life of these systems or products.


• If these items are not budgeted for over the next few years, the cost
    of such projects will have large impacts on the operating budget of
    Colchester Public Schools.


•   With these projects identified as a need, the district will be able to
    explore various vendors and determine the most cost effective and
    durable products.
PROJECTS FOR FUTURE PLANNING
•   Bacon Academy Parking Lot and Asphalt
•   CES Parking Lot
•   JJIS Parking Lot and Asphalt
•   CES Chiller Replacements
•   JJIS Chiller Replacements
•   JJIS Roof Repair
•   JJIS Fire Alarm System
•   CES Fire Alarm Upgrade
    JUSTIFICATION

• The previously identified projects are currently functioning
  and with proper maintenance and/or timely repairs will
  operate and be safe for students for some time. These
  projects are in need of upgrades or replacement due to
  their age and constant use.
• Some of these projects may have future grants available to
  help fund these projects.
ONGOING PROJECTS
•   CES Window Shades
•   Bacon Vegetation
•   Sound Fields
•   Furniture Replacement Cycle
•   Security Film for Windows
•   WJJMS Gymnasium Floor
•   WJJMS Awning
•   WJJMS Security Camera Upgrade
•   WJJMS Toilet and Drainage
    Replacement
•   Bacon Window Shades
•   Bacon Floor Coverings
 JUSTIFICATION
The On Going Projects for the district are steady
 improvements to our current facilities.
While these do not currently impact the safety of
 our students or our ability to educate them, they do cause
 some disruptions to the learning environment.
By addressing above mentioned projects, Colchester Public
 Schools would optimize our current school buildings and
 create a cycle of improvement.
RECOMMENDATIONS
•   The Facilities Committee would
    recommend that the district
    and Board of Education
    commit to a long-term funding
    cycle to address identified
    needs.
•   A regular funding cycle should
    help avoid situations like we
    face with the athletic complex
    and lessen the impact on the
    budget for any one year.
     THANK YOU
    Daniel P. Sullivan, III,
     Superintendent

• Pride & Purpose Facilities•
   Matthew                         Judy
     Committee
    Parsons, Co-Chair              O’Meara, Co-Chair
•   Amy Begué                  •   Renee Anderson
•   Christopher Bennett        •   Steve Browning
•   Lynette Dimock             •   Kevin Burke
•   Ronald Goldstein           •   Margo Gignac - BOE
•   Christina Maher            •   Brian Martin
•   Christopher Rivers -       •   Joesph Leone
    BOE                        •   Angie Parkinson
•   Skip Starks                •   Jennifer Reynolds
•   Keith Morrissette